Tuesday 19 June 2007

Quick update on the house

Things have moved along nicely out in Vaughan. The exterior of our home now has been bricked. It looks like things will work out for a move at the end of August.

We had our pre-drywall inspection last week, and the drywall was up soon thereafter. Canada Post have also acknowledged the new neighbourhood, by allocating our postal code!

- Wall frames are up, windows are in
- Pot light fixtures in the kitchen have been installed
- Central vacuum rough-in has been installed
- HVAC (heating vents) and vents for dryer and kitchen range hood are in
- Electrical wiring for plugs and lights is complete
- Wiring for cable (TV and internet) and telephone has been put int
- Plumbing for water and drainage is in
- Roof has been shingled
- Oak staircase has been installed
- Basement and garage floors have been poured
- Gas and electricity board and meters installed, but not yet hooked up
- Insulation has been put in the walls and they have been drywalled
- Bath-tubs have been put in
- Garage door has been put in



You can check out more photos of the progress on the building in the Thornhill Woods subdivision on Westolivia Trail: http://s207.photobucket.com/albums/bb84/thw-pics/